- Architecture, Planning & Construction
- Audit & Advisory Services
- Bookstore
- Buying Products & Services
- Camp Tontozona
- Facilities & Operations
- Finance & Accounting
- Forms
- Human Resources
- Legal Affairs
- Mail Services
- News & Announcements
- Parking & Transportation
- Police & Safety
- Policies & Procedures
- Property Control
- Sun Card
- Technology
- Trademark Management
- Training & Development
- Travel
- University Club
- Vendors & Licensing
Utility Outages and Shutdown Notices
Updated November 20, 2009
Outages
Buildings: Wilson Hall Bldg # 50
Areas: entire Bldg.
Service Outage: Electrical High Voltage/Low Voltage
Shutdown Date: Friday, November 20, 2009, 10:00 PM
Restored Date: Sunday, November 22, 2009, 10:00 PM
Reason: Remove Temp.Generator and complete the instalaltion of the new transformer and SES.
Details: Upgrade the utilities.
Buildings: Payne Hall #6B
Areas: entire Bldg
Service Outage: Electrical High/Low Voltage
Shutdown Date: Friday, November 20, 2009, 10:00 PM
Restored Date: Sunday, November 22, 2009, 10:00 PM
Reason: Remove Temp. generator and complete the instalaltion of the new transformer and the SES. This is a 48 hrs shutdown.
Details: Utility upgrade.
Buildings: Dixie Gammage bldg# 9
Areas: Entire Bldg
Service Outage: Electrical High Voltage
Service Outage: Electricial Low Voltage
Shutdown Date: Friday, November 20, 2009, 10:00 PM
Restored Date: Sunday, November 22, 2009, 10:00 PM
Reason: Complete installation of the new transformer and SES.
Details: Utility upgrade.
Buildings: Lang & Lit. BLDG #12
Areas: Entire Bldg
Service Outage: Electrical High/Low Voltage
Shutdown Date: Friday, November 20, 2009, 10:00 PM
Restored Date: Sunday, November 22, 2009, 10:00 PM
Reason: Shutdown is necessary to repalce transformer and SES. This is a 48 hras shutdown.
Details: Utility upgrade
Buildings: West side of Central Plant and Murdock Hall
Areas: West side of Central Plant(all) and Murdock Hall
Service Outage: Electrical High Voltage
Shutdown Date: Monday, November 23, 2009, 2:00 AM
Restored Date: Monday, November 23, 2009, 6:00 AM
Reason: Installation of Electrical Metering on the west side of the Central Plant and Murdock Hall electrical meter.
Details: Shutdown in the Central plant could be longer than the expected 4 hours. Murdock Hall will be back on line by 6:00 AM.
Buildings: Art Bldg#87,NEEB Hall # 86, Colldge of Design # 88, Art Warehouse# 94, Parking Structure Ps03
Areas: Buildings are as noted.
Service Outage: Electrical High/Low Voltage
Shutdown Date: Sunday, November 22, 2009, 12:00 AM
Restored Date: Sunday, November 22, 2009, 9:00 AM
Reason: Shutdown is necessary to repalce the outdated transformer and SES gear. This is a 9 hrs shutdown.
Details: Utility upgrade.
Buildings: Hayden Library
Areas: 4th Floor (Security / Fire Alarm) in Above Ceilings Space
Service Outage: Fire Alarm
Shutdown Date: Monday, November 23, 2009, 12:00 AM
Restored Date: Monday, November 23, 2009, 5:00 AM
Reason: Investigate Roof Drain Assembly from underside of Roof Deck through 4th Floor Ceiling System. The Security System above ceiling at Hayden Library on the 4th Floor is tied into the Fire Alarm. In order to perform this exploratory of Roof Drain Assemblies we require a temporary shutdown.
Details: This investigation will allow CORE Construction and its plumbing contractor to understand what materials and the scope of work required to repair (replace) the 11 Roof Drain Assemblies at Hayden Library. Subsequent Shutdown Requests will be submitted for your approval to perform actual repairs and replacements where required.
Buildings: Physical Science F wing basement
Areas: Dr. Anbar's lab area.
Service Outage: Exhaust and Cooling
Shutdown Date: Monday, November 23, 2009, 6:00 AM
Restored Date: Wednesday, November 25, 2009, 4:00 PM
Reason: Shutdown AH-1 for Dr. Anbar's lab and the associated exhaust in order to replace SS duct inn the mechancal room.
Details: Duct upgrade.
Buildings: Goldwater Center
Areas: All Laboratories (air handlers 3 & 4 and combined exhaust fans)
Service Outage: Exhaust, Heating, Cooling, Other
Shutdown Date: Wednesday, November 25, 2009, 4:00 PM
Restored Date: Monday, November 30, 2009, 8:00 AM
Reason: Converting Laboratory HVAC and Exhaust systems to digital control and automation. All supply ventilation and exhuast in laboratories will be off!
Details: Building must be vacated before ventilation is shut down. No occupancy for campus community during this period. All chemicals and hazardous materials must be safely stored before the shut-down and must stay that way until Monday morning after restart of systems. Also on site for APSES call Mike McGill 1-928-210-7227
Buildings: Goldwater Center
Areas: All
Service Outage: Exhaust, Heating, Cooling, Other
Shutdown Date: Friday, November 27, 2009, 6:00 AM
Restored Date: Sunday, November 29, 2009, 8:00 AM
Reason: Replace Air Handlers and Exhaust systems controls with digital.
Details: All supply air and exhaust air service to all laboratories will be off. Building must be unoccupied before shut-down, and must remain unoccupied for the duration of the shut-down. All chemicals and hazardous materials must be safely and properly stowed before the shut-down and must remain so for the duration.
Fire Alarm Testing
none scheduled
Submittals
Submit a UTILITY SHUTDOWN REQUEST
Please refer any questions or concerns to our Service Center @ 480.965.1849 or via e-mail at FACMAN@asu.edu.